Date
22 September 2022Summary:
Between 19:00 – 23:00 on Thursday 22nd September a traffic management system will be in place at the R138/N11 entrance to facilitate installation of a traffic induction loop on campus by Dublin City Council. For the duration of the works all traffic entering and exiting the campus via the campus roadways will be managed by temporary traffic signals and traffic stewards.
When installed this loop will enable a smoother flow of traffic exiting the campus via the R138 entrance at peak times.
Apologies for any inconvenience which may be caused during these works.
Area / Buildings:
Belfield Campus